Bond Details by School Building

Each school in the district will see improvements in their school as a result of this bond. See the included graphics and details below for a more specific list of how the bond funding will benefit each school.

Discovery Elementary

See the Building Graphic of Proposed Remodeling

  • Secure Main Office-public enters the school through the main office
  • Convert Existing School Office into Classroom Space
  • Add 3 Security Cameras and System Upgrades
  • Replace Roof-48,450 square feet
  • Expand Parking Lot-22,000 square feet
  • Exterior Concrete Molding Repair
  • Refinish Gymnasium Floor
  • Exterior Door Replacement (2 Entries-4 Doors and Side Lights)
  • Replace 4 Windows in Early Childhood Family Education Area
  • Replace Exterior Auditorium Steps
  • Replace Auditorium Balcony Seating and 66' Front Guard Rail

Hanover Elementary

See the Building Graphic of Proposed Remodeling

  • Secure Main Office-public enters the school through the main office
  • Convert Existing School Office into Classroom Space
  • Add 4 Security Cameras and System Upgrades
  • Replace Roof-10,700 square feet
  • HVAC Modifications

Montrose Elementary

  • Add 3 Security Cameras and System Upgrades
  • Replace Roof-2,400 square feet
  • Window Replacement-6 on west side
  • Sidewalk Replacement-750 feet
  • Replace Maintenance Equipment
  • Main Gymnasium Floor Replacement

Northwinds Elementary

  • Replace Intercom and Bell System
  • Seal Coat Parking Lot and Paths-133,623 square feet

Parkside Elementary

  • Health Office Remodel
  • Add 3 Security Cameras and System Upgrades
  • Roof Replacement-43,813 square feet
  • Asphalt Work-45,000 square feet
  • Add Parking Lot-north end of school; 60 stalls
  • Replace Storage Shed

Tatanka Elementary

See the Building Graphic of the Proposed Remodeling

  • Secure Main Office-public enters the school through the main office
  • Convert Existing School Office into Classroom Space
  • Add 4 Security Cameras and System Upgrades
  • Replace Roof-9,600 square feet
  • Replace Parking Lots-86,200 square feet
  • Finish Abatement and Replace Gymnasium Tile
  • Add 4 Classrooms (Kindergarten) and Gymnasium (80x96 feet)
  • Add Bathrooms and Storage
  • Add Music Room-remodel existing music space for new school entry
  • Replace Boiler

Buffalo Community Middle School

See the Building Graphic of the Proposed Remodeling

  • Add 5 Security Cameras and System Upgrades
  • Replace Roof-26,200 square feet
  • Pool Upgrades-addition for pool entrance (3,050 square feet), family locker rooms, storage, HVAC improvements, and a new water filtration system
  • Pool Locker Room Updates-new flooring, shower tile, fixtures and lockers
  • Repair Interior Walls-to prevent water infiltration
  • Replace Parking Lots-209,300 square feet
  • Remodel "Northstar" Section-add a hallway to create stand alone classrooms
  • Add Power Bleacher Pullers
  • Replace Lower-Level Ceiling Tile-3,875 square feet
  • Replace Over 500 Lockers throughout the School
  • Replace Carpet-21,500 square feet
  • Exterior Door Replacement (1 Entry-4 Doors and Side Lights)
  • Field Improvements-irrigation and drainage at football field and adjacent site (6 acres)

Buffalo High School

See the Building Graphic of the Proposed Remodeling

  • Add 6 Security Cameras and System Upgrades
  • Replace Intercom and Bell System
  • Replace Roof-172,625 square feet
  • Seal Coat and Asphalt Repair of Parking Lots-603,000 square feet
  • Replace Pneumatic Controls with Electronic Controls for HVAC System
  • Replace Maintenance Equipment
  • Renovate Classroom-2,750 square feet
  • Add Gymnasium
  • Add Multi-Purpose Fine Arts Classroom-2,945 square feet
  • Athletic Field Additions and Upgrades-synthetic multi-purpose field, sand-peat               multi-purpose field and track, baseball field renovations, relocation of softball fields, and grading for usability and drainage

Activity Venue

See the Graphic for Buffalo High School Outdoor Activity Venue Improvements

  • Buffalo High School Athletic Field Additions and Upgrades-synthetic multi-purpose field, sand-peat multi-purpose field and track, baseball field renovations, relocation of softball fields, and grading for usability and drainage

District-Wide Maintenance

  • Expand Asphalt Parking Lot at the Bus Garage
  • Tuck Pointing Exterior Walls and Openings at Discovery, Hanover, Montrose, Parkside, Tatanka and Buffalo Community Middle School-625,000 square feet

District-Wide Technology

All schools (including PRIDE Transitions and Phoenix Learning Center) in the district will see upgrades in technology. Work will be done to upgrade and replace the district's technology infrastructure, replace existing equipment, and add more computers and software.

Monday Sep 8, 14

Discovery Elementary (PDF - 1.44 MB)

Discovery Elementary's proposed new, secure entrance.

Monday Sep 8, 14

Hanover Elementary (PDF - 1.45 MB)

Hanover Elementary's proposed new, secure entrance.

Monday Sep 8, 14

Tatanka Elementary (PDF - 1.44 MB)

Tatanka Elementary's proposed new, secure entrance and building additions.

Monday Sep 8, 14

Buffalo Community Middle School Pool Area (PDF - 1.45 MB)

Buffalo Community Middle School's proposed new, pool area upgrades and addition.

Monday Sep 8, 14

Buffalo High School (PDF - 1.45 MB)

Buffalo High School's proposed new, building additions.

Monday Sep 8, 14

Activity Venue (PDF - 457.71 KB)

Buffalo High School's proposed field improvements and upgrades.